UNI 5KN-10KN High Precision Servo Electric Cylinder with Sensors PLC controllable

Description

5KN High Precision Servo Cylinder is manufactured by Shenzhen UNI Technology CO.,LTD. Those electric cylinder are provided with NPN/PNP type sensors. PLC panel can precisely control the movment of servo cylinder as well. Servo drive used can control the position and torque with analog inputs. Please contact us to fulfill more control ways.

5KN High Precision Servo Cylinder

Technical Date

ProductUNI-R80L200
Pitch/Screw Lead(mm)510
Max Force(N)10,0005000
Max Stroke(mm)20002000
Max Speed(mm/s)16683
Repeatability Accuracy(mm)0.020.02
Ball Screw Diameter(mm)1616
Axial Backlash(mm)0.02-0.040.02-0.04

Dimension

FAQ

Q1. What is the duty cycle of UNI electric linear actuator?
A1: 100% Duty Cycle. The electric servo linear actuators or stepper motor linear actuators can work continuously.

Q2. What is the life time of UNI electric linear actuator?
A2: The life time of our servo linear actuators can run more than 100,000km for life.

Q3. Are you a trading company or factory?
A2: We are the manufacturer specialized in electric linear actuators since the year 2014, and we have been mainly exporting to major equipment manufacturers in Europe, North America, South America, and Southeast Asia these years.

Q4. What is the max thrust UNI electric linear actuator can provide?
A4: The load capacity of UNI electric linear actuator is 0~20tons.

Q5. Does UNI electric linear actuator drived by ball screw or lead screw?
A7: Our standard UNI electric linear actuators are drived by ball screw, because it is of higher transmission effeciency than that of lead screw.Lead screw as the drive system for the electric linear actuator suitable for those who concerned about the cost.

Q6. Our requirements for the elctric linear actuators are beyond your current catalog, can you support OEM and ODM ?
A8. Yes, OEM and ODM services are available.We are able to customize exactly according to customers’ requirements.No MOQ required.

Q7. What is your delivery time on samples and massive production ?
A9: Normally, the sample delivery time is 5-7 days. The massive production delivery time is 12 days.