4DOF Car Simulator Actuator Kits with Dorna/Unity/Simtools/Real Engine

For entaining/training/educating simulator

Description

4DOF Car Simulator Actuator Kits are manufactured by Shenzhen UNI Technology Co.,Ltd. We make the custom floor contacts. It fixes the actuators to the ground. Also, the bracket will be attached to the simulator frame together.

UNI Simulator rig are intend for 9d VR racing simulator. It is quick in response and fast in velocity. What’s more, the whole rig offers bigger payload. The high frequency and acceleration allows you an immersive VR experience. We can provide you a controller from drive to your PC. What you need to do is to operate the game.

4DOF motion system with roll, pitch, yaw, and sway which allows you to feel the limit of adhesion, understeer/oversteer, terrain changes such as hills, banking, curbing, bumps, camber, and both left/right and fore/aft weight transfer in a motion simulator like you have never felt in a sim.

DIY 4DOF Car Simulator
4DOF Car Simulator Actuator Kits

Technical Date

ProductUNI-4DOF
Pitch/Screw Lead(mm)510
Payload(KG)500250
Max Stroke(mm)20002000
Max Speed(mm/s)333500
Roll/Pitch/Yaw(Cont.)±30°±30°
Acceleration2g2g
Precision±0.1°±0.1°

Dimension

FAQ

4DOF simulator actuator

4DOF Simulator whole kit with custom floor contacts (non-captive floor) and brackets.

Q1. How much payload do I need for 4DOF simulator rig?
A1: We have to consider a person, frame and cockpit weight. Heavy weight comes along with high moment of inertia. As a result, safety magin is needed. It is recommend to choose platform that can handle twice the real payload.

Q2. Does 100kg are enough for 4 DOF actuators?
A2: Well, if the platform tilt to one side, then the payload will exert to one actuator.  As a result, 100kg load of single actuator are far from enough.

Q3. Can you provide a plug and play solution?
A3: Yes, we can provide you simulator kit with controller integrated. Different softwares, protocols, connections, expertise will be applied. We have engineer team to instruct installation. Furthermore, on-site debugging is available.

Q4. What is the lead time of your UNI 4DOF Simulator Actuator?
A4: Normally, 7 days are fine for the completion.